Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
American Tin Ceilings
Tin Backsplash [5 (Pattern #3 / Bright White Satin)
Tin Backsplash [5 (Pattern #3 / Bright White Satin)
Couldn't load pickup availability
⭐ Key Features
•BEAUTIFUL DESIGN: The KIT5-B-P03-WBS Features our #3 pattern which is a beautiful small floral diamonds design in a stunning bright white satin
•KIT COMPONENTS: [Pack of 5] 2ft x 2ft genuine tin tiles, (2) 2ft edge trim molding, (1) 2ft inside corner molding.
•TIGHT SEAMS FOR A SEAMLESS LOOK: Backsplash tiles contain a 3/8” nail rail that overlaps for tight seams.
•HEAT RESISTANCE: Tin tiles are T1 grade tin plated steel and 0.010 thick, carrying an ASTM E 84-03b approval rating (Surface Burning Characteristics of Building Materials). One hour fire rating.
•PREMIUM FINISH: a commercial-grade powder coat finish is applied and baked on to prevent rust.
🛠️ Specifications
• Brand : American Tin Ceilings
• Size : Pattern #3
• Color : Bright White Satin
• Material : Tin, Steel
• Unit : 20 Sq Ft
• Included components : 5 tiles
• Number of items : 5
• Package quantity : 1
• Pattern : Pattern #3
• Special features : Heat Resistant
• Style : Classic
• Type : TILE
• Item dimensions : H: 0.1 / L: 24.0 / W: 24.0 (Weight: 10.0)
Share

Blog posts
View all-
Carbon Steel vs Nonstick Cookware: A Comprehens...
Carbon Steel vs. Nonstick Cookware: Which Should You Buy? (2026) Carbon Steel vs. Nonstick Cookware: Which Should You Buy? By Kitchen Team | March 2026 | 9 min read Carbon...
Carbon Steel vs Nonstick Cookware: A Comprehens...
Carbon Steel vs. Nonstick Cookware: Which Should You Buy? (2026) Carbon Steel vs. Nonstick Cookware: Which Should You Buy? By Kitchen Team | March 2026 | 9 min read Carbon...
-
Best Air Fryer 2026 – Our Top 10 Tested for You...
Best Air Fryer of 2026 – We Tested 10 So You Don't Have To | Pawvie Kitchen Best Air Fryer of 2026 – We Tested 10 So You Don’t Have...
Best Air Fryer 2026 – Our Top 10 Tested for You...
Best Air Fryer of 2026 – We Tested 10 So You Don't Have To | Pawvie Kitchen Best Air Fryer of 2026 – We Tested 10 So You Don’t Have...
-
The Microbiome Salad That Might Actually Slow D...
A vibrant microbiome salad bowl loaded with colorful vegetables and chickpeas — food that feeds your gut, not just your hunger Slowing Down How You Age Might Be Simpler Than...
The Microbiome Salad That Might Actually Slow D...
A vibrant microbiome salad bowl loaded with colorful vegetables and chickpeas — food that feeds your gut, not just your hunger Slowing Down How You Age Might Be Simpler Than...